Bali Zero
  • Home
  • Visa
  • Tax
  • Property
Get Started
KBLI Navigator/Section F/42997
KBLI 42997

Radiation Facility Construction

Konstruksi Bangunan Sipil Fasilitas Sumber Radiasi Pengion

🏗️ Section F — Construction

In Bali: open to a PT PMA

✅Open· 100% ForeignMedium-High RiskAggregated🏝️✅Registrable in Bali· medium conf.✓OSS-verified · KBLI 2025

Building Indonesia’s Ionising-Radiation Facilities

This construction and consultancy activity is nationally open to full foreign ownership, with Bali not marked as blocked by its PMA moratorium.

By the numbers
Foreign-ownership ceiling
100%
Open business scales
Mikro, Kecil, Menengah, Besar
National PMA source
Perpres 10/2021, 49/2021
Bali status
Registrable in Bali
A foreign investor may register this activity in Bali because the record does not place it within the moratorium’s barred risk categories.
What Changed

KBLI 2020→2025 mapping: matched with aggregation.

What You Need

Nationally, this KBLI is 100% open to foreign ownership. In Bali, it is not blocked by the general moratorium, but it is flagged as medium-high risk, meaning your project will face stricter licensing scrutiny and must be verified for compliance at the specific address—so you cannot simply drop it anywhere on the island.

Who This Is For

A foreign investor with deep expertise in medical or industrial radiation infrastructure, likely partnering with a major hospital, research institution, or energy/healthcare group that can secure a suitable location and navigate high-risk permits.

Licensing Overview
Risk LevelMenengah Tinggi
License TypeNIB + Sertifikat Standar
Foreign Ownership100% Open
Processing30 working days
2020 → 2025
Previous codes (KBLI 2020): 42930
BPS crosswalk
Official BPS 2020 → 2025 crosswalk ancestors: 42930, 43293

Source: the BPS 2020↔2025 conversion table, mechanically extracted and acceptance-gate verified. It shows which 2020 codes map to this 2025 code — provenance only, not a licensing claim: the regulatory regime of these predecessor codes has not been adjudicated as transferring.

🔨
Read Full Guide on Bali Zero↗

KBLI 2025 Construction: Building Development, Villa Projects & Prefab

kita.balizero.com

Sources & Verification

Each data layer below traces to a government source with its KBLI vintage — or is declared as a gap. Nothing in these layers is silently filled in.

Activity definition
BPS Peraturan 7/2025 + PP 28/2025VerifiedKBLI 2025

Title and scope as defined by the KBLI-2025 classification.

locator: OSS_RBA_2025_id_version_fff4053d

Risk & licensing
OSS RBA risk scope (ruang lingkup)VerifiedKBLI 2025

Risk category and licensing rows are KBLI-2025-native from the OSS Risk-Based Approach catalog.

locator: OSS_RBA_resiko_2025

Foreign ownership (PMA)
Perpres 10/2021, 49/2021Audit pendingKBLI 2020

The investment-list annexes predate KBLI 2025; the per-code crosswalk audit of this layer is in progress. The value shown is the annex text, disclosed with its vintage.

Bali status
Bali province blocks ALL Low + Medium-Low risk KBLI for PMA (island-wide, permanent) (effective 2026-05-13)Audit pending2026 overlay

Conservative posture derived from the risk tier · confidence MEDIUM.

Dataset last updated 2026-07-26 · KBLI 2020 and KBLI 2025 reuse code numbers for different activities — cross-vintage rows are labeled, never merged silently.

Common Questions
Can foreigners operate a radiation facility construction business in Indonesia?
Yes. KBLI 42997 (Konstruksi Bangunan Sipil Fasilitas Sumber Radiasi Pengion) is TERBUKA — open to 100% foreign ownership via PT PMA. No local Indonesian partner required. (Source: Perpres 10/2021 as amended by Perpres 49/2021 — the investment-list annexes predate KBLI 2025; per-code crosswalk audit in progress.)
What license is required for KBLI 42997?
KBLI 42997 has a Menengah Tinggi risk classification. Required license: NIB + Sertifikat Standar. Processing time: 30.
What is KBLI 42997?
KBLI 42997 is the Indonesian business classification code for "Konstruksi Bangunan Sipil Fasilitas Sumber Radiasi Pengion" (Radiation Facility Construction). It falls under Section F of KBLI 2025, the Indonesian Standard Industrial Classification updated by BPS (Regulation 7/2025). The June 2026 KBLI 2025 transition window has closed; operators should verify the code's current OSS/NIB treatment before relying on it for licensing, reporting, or amendments.
How did KBLI 42997 change from KBLI 2020 to 2025?
KBLI 42997 was mapped from previous code 42930 (KBLI 2020). Multiple 2020 codes were merged into this single 2025 code. The June 2026 KBLI 2025 transition window has closed. If an NIB still relies on legacy KBLI 2020 mappings, treat the migration as overdue and verify/remediate the OSS record before new license applications, amendments, LKPM, import approvals, or investor/worker sponsorship.

Related Codes

42998Section F

Nuclear Reactor Civil Works Construction

Konstruksi Bangunan Sipil Reaktor Nuklir

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
42996Section F

Military & Spaceport Facility Construction

Konstruksi Bangunan Sipil Fasilitas Militer dan Bandar Antariksa

→
🏝️✅Registrable in Bali✅Open· 100% ForeignMedium-High Risk
42999Section F

Other Civil Engineering Construction

Konstruksi Bangunan Sipil Lainnya Ytdl

→
🏝️✅Registrable in Bali✅Open· 100% Foreign
42995Section F

Processing Plant Civil Works Construction

Konstruksi Bangunan Sipil Fasilitas Pengolahan

→
🏝️✅Registrable in Bali✅Open· 100% ForeignMedium-High Risk
42994Section F★

Sports Facility Construction

Konstruksi Bangunan Sipil Fasilitas Olahraga

→
🏝️✅Registrable in Bali✅Open· 100% ForeignMedium-High Risk
42993Section F

Geothermal Civil Works Construction

Konstruksi Bangunan Sipil Panas Bumi

→
🏝️✅Registrable in Bali✅Open· 100% ForeignMedium-High Risk
🏢

Ready to register this business?

Bali Zero handles PT PMA setup, KBLI registration, NIB, and all licensing for KBLI 42997.

PT PMA Setup

IDR 20.000.000

Company registration, KBLI, NIB, domicile

Virtual Office

IDR 5.000.000

Legal address for your PT PMA in Bali

5,000+ companies registered since 2020

Get started on WhatsApp
5k+
Clients
★ 4.9
Reviews
~15 min
Response
Talk on WhatsApp
Zantara AIOSS Intelligence System
Context42997
Ask me anything about KBLI 42997 — Radiation Facility Construction. Licensing, PMA rules, what changed in 2025, or how it works in Bali.