Bali Zero
  • Home
  • Visa
  • Tax
  • Property
Get Started
KBLI Navigator/Section D/35111
KBLI 35111★ Gold-Tier Intel

Emitting Non-Renewable Power Generation

Pembangkitan Tenaga Listrik dari Sumber Energi Tidak Terbarukan yang Menghasilkan Emisi

⚡ Section D — Electricity & Gas Supply

In Bali: open to a PT PMA

✅Open· 100% ForeignHigh RiskDirect Match🏝️✅Registrable in Bali· medium conf.✓OSS-verified · KBLI 2025

Fossil Power Generation, Open Nationally and Not Blocked in Bali

This code covers fossil-fuel electricity generation, including carbon-credit sales by the power producer, with full national PMA access and no Bali moratorium block.

By the numbers
National PMA status
TERBUKA
National foreign-ownership ceiling
100%
Open scales
Mikro, Kecil, Menengah, Besar
Bali status
Registrable in Bali
For this activity, a PMA can look at Bali without a moratorium block in the slim record, while still respecting the exact risk and scale framing stated there.
Licensing & Requirements

What You Need

Risk LevelHigh (Tinggi)
License TypeNIB + Izin
Processing14 working days
Foreign Ownership100% Open
AuthorityBKPM / OSS
PP28/2025 Licensing Data4 scales
Business scale:
MikroHigh RiskNIB + Izin⏱ 14Fiktif Positif
Requirements (Indonesian)3
1Studi Kelayakan usaha penyediaan tenaga listrik, dengan ketentuan dokumen (berbahasa Indonesia) berisi: a. Kajian kelayakan finansial b. Kajian kelayakan operasional c. Studi interkoneksi jaringan d. Lokasi instalasi e. Diagram satu garis f. Jenis dan kapasitas usaha yang akan dilakukan g. Jadwal pembangunan dan h. Jadwal pengoperasian yang disusun oleh Badan Usaha yang tersertifikasi
2Kesepakatan jual beli tenaga listrik antara pemohon dengan calon pembeli tenaga listrik (PJBL beserta amandemennya), dengan harga jual tenaga listrik dalam PJBL yang: a. Sesuai dengan ketentuan harga jual tenaga listrik atau
3Harga jual tenaga listrik dalam PJBL telah mendapatkan persetujuan harga jual tenaga listrik dari Menteri/ Gubernur sesuai dengan kewenangannya dalam menetapkan perizinan berusaha
Post-License Obligations5
Instalasi yang akan dioperasikan wajib memiliki Sertifikat Laik Operasi
Pengoperasian dilakukan oleh Tenaga Teknik yang memiliki Sertifikat Kompetensi
Peralatan yang digunakan memenuhi Standar Nasional Indonesia yang diberlakukan Wajib
Melaporkan kegiatan usaha secara berkala kepada Direktur Jenderal.
Rekomendasi Persetujuan dan penandasahan Rencana Impor Barang dalam hal Badan Usaha melakukan impor barang modal untuk mendapatkan fasilitas pembebasan bea masuk.
⚠Regulatory Alert
2020 → 2025

Updated for KBLI 2025 catalog. Check migration requirements.

Bali Intelligence

Complementary Codes

Sources & Verification

Each data layer below traces to a government source with its KBLI vintage — or is declared as a gap. Nothing in these layers is silently filled in.

Activity definition
BPS Peraturan 7/2025 + PP 28/2025VerifiedKBLI 2025

Title and scope as defined by the KBLI-2025 classification.

locator: OSS_RBA_2025_id_version_fff4053d

Risk & licensing
OSS RBA risk scope (ruang lingkup)VerifiedKBLI 2025

Risk category and licensing rows are KBLI-2025-native from the OSS Risk-Based Approach catalog.

locator: OSS_RBA_resiko_2025

Foreign ownership (PMA)
Perpres 10/2021, 49/2021Audit pendingKBLI 2020

The investment-list annexes predate KBLI 2025; the per-code crosswalk audit of this layer is in progress. The value shown is the annex text, disclosed with its vintage.

Bali status
Bali province blocks ALL Low + Medium-Low risk KBLI for PMA (island-wide, permanent) (effective 2026-05-13)Audit pending2026 overlay

Conservative posture derived from the risk tier · confidence MEDIUM.

Dataset last updated 2026-07-26 · KBLI 2020 and KBLI 2025 reuse code numbers for different activities — cross-vintage rows are labeled, never merged silently.

Common Questions
Can foreigners operate a emitting non-renewable power generation business in Indonesia?
Yes. KBLI 35111 (Pembangkitan Tenaga Listrik dari Sumber Energi Tidak Terbarukan yang Menghasilkan Emisi) is TERBUKA — open to 100% foreign ownership via PT PMA. No local Indonesian partner required. (Source: Perpres 10/2021 as amended by Perpres 49/2021 — the investment-list annexes predate KBLI 2025; per-code crosswalk audit in progress.)
What license is required for KBLI 35111?
KBLI 35111 has a Tinggi risk classification. Required license: NIB + Izin. Processing time: 14.
What is KBLI 35111?
KBLI 35111 is the Indonesian business classification code for "Pembangkitan Tenaga Listrik dari Sumber Energi Tidak Terbarukan yang Menghasilkan Emisi" (Emitting Non-Renewable Power Generation). It falls under Section D of KBLI 2025, the Indonesian Standard Industrial Classification updated by BPS (Regulation 7/2025). The June 2026 KBLI 2025 transition window has closed; operators should verify the code's current OSS/NIB treatment before relying on it for licensing, reporting, or amendments.
How did KBLI 35111 change from KBLI 2020 to 2025?
KBLI 35111 was mapped from previous code 35111 (KBLI 2020). This is a direct match — the code number and scope remained the same. The June 2026 KBLI 2025 transition window has closed. If an NIB still relies on legacy KBLI 2020 mappings, treat the migration as overdue and verify/remediate the OSS record before new license applications, amendments, LKPM, import approvals, or investor/worker sponsorship.

Related Codes

35112Section D★

Non-Emitting Non-Renewable Power Generation

Pembangkitan Tenaga Listrik dari Sumber Energi Tidak Terbarukan yang Tidak Menghasilkan Emisi

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35120Section D

Renewable Power Generation

Pembangkitan Tenaga Listrik dari Sumber Energi Terbarukan

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35131Section D

Electricity Transmission

Aktivitas Penyaluran Tenaga Listrik

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35132Section D

Electricity Storage

Aktivitas Penyimpanan Tenaga Listrik

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35133Section D★

EV & Electrical Equipment Charging Stations

Pengoperasian Fasilitas atau Stasiun Pengisian Daya untuk Kendaraan dan Peralatan Listrik

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35140Section D

Integrated Electricity Supply Business

Penyediaan Tenaga Listrik dalam Satu Kesatuan Usaha

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
🏢

Ready to register this business?

Bali Zero handles PT PMA setup, KBLI registration, NIB, and all licensing for KBLI 35111.

PT PMA Setup

IDR 20.000.000

Company registration, KBLI, NIB, domicile

Virtual Office

IDR 5.000.000

Legal address for your PT PMA in Bali

5,000+ companies registered since 2020

Get started on WhatsApp
5k+
Clients
★ 4.9
Reviews
~15 min
Response
Talk on WhatsApp
Zantara AIOSS Intelligence System
Context35111
Looking at KBLI 35111? Let me walk you through the 2025 requirements, PMA rules, and what changed for foreign investors in Bali.