Bali Zero
  • Home
  • Visa
  • Tax
  • Property
Get Started
KBLI Navigator/Section D/35132
KBLI 35132

Electricity Storage

Aktivitas Penyimpanan Tenaga Listrik

⚡ Section D — Electricity & Gas Supply

In Bali: open to a PT PMA

✅Open· 100% ForeignHigh RiskRenumbered🏝️✅Registrable in Bali· medium conf.✓OSS-verified · KBLI 2025

Electricity Storage With a Clear Bali Path

KBLI 35132 covers power storage, battery-swap infrastructure, and reconversion of stored energy, open nationally to full foreign ownership and not blocked in Bali.

By the numbers
Foreign ownership ceiling
100%
Scales open to registration
Mikro, Kecil, Menengah, Besar
Bali status
Registrable in Bali
PMA source
Perpres 10/2021, 49/2021
This is a nationally open, 100% foreign-ownership activity, and the Bali-side record does not close it to PMA registration.
What Changed

KBLI 2020→2025 mapping: code renumbered.

What You Need

In Bali, the island-wide moratorium (in force since 13 May 2026) only halts PMA registrations for Low and Medium-Low risk lines — this KBLI's large-scale (Besar) risk class is higher, so it is not caught: PMA registration in Bali remains possible.

Who This Is For

Foreign entrepreneurs planning utility-scale energy storage projects or EV battery swapping networks in Indonesia, though not currently registrable for a Bali-based venture.

Licensing Overview
Risk LevelTinggi
License TypeNIB + Izin
Foreign Ownership100% Open
Processing14 working days
2020 → 2025
Previous codes (KBLI 2020): 35114— PP28 uses KBLI 2020 code 35114 (Penjualan Tenaga Listrik...). Match: 94%
BPS crosswalk
Official BPS 2020 → 2025 crosswalk ancestors: 35112, 35113

Source: the BPS 2020↔2025 conversion table, mechanically extracted and acceptance-gate verified. It shows which 2020 codes map to this 2025 code — provenance only, not a licensing claim: the regulatory regime of these predecessor codes has not been adjudicated as transferring.

Sources & Verification

Each data layer below traces to a government source with its KBLI vintage — or is declared as a gap. Nothing in these layers is silently filled in.

Activity definition
BPS Peraturan 7/2025 + PP 28/2025VerifiedKBLI 2025

Title and scope as defined by the KBLI-2025 classification.

locator: OSS_RBA_2025_id_version_fff4053d

Risk & licensing
OSS RBA risk scope (ruang lingkup)VerifiedKBLI 2025

Risk category and licensing rows are KBLI-2025-native from the OSS Risk-Based Approach catalog.

locator: OSS_RBA_resiko_2025

Foreign ownership (PMA)
Perpres 10/2021, 49/2021Audit pendingKBLI 2020

The investment-list annexes predate KBLI 2025; the per-code crosswalk audit of this layer is in progress. The value shown is the annex text, disclosed with its vintage.

Bali status
Bali province blocks ALL Low + Medium-Low risk KBLI for PMA (island-wide, permanent) (effective 2026-05-13)Audit pending2026 overlay

Conservative posture derived from the risk tier · confidence MEDIUM.

Dataset last updated 2026-07-26 · KBLI 2020 and KBLI 2025 reuse code numbers for different activities — cross-vintage rows are labeled, never merged silently.

Common Questions
Can foreigners operate a electricity storage business in Indonesia?
Yes. KBLI 35132 (Aktivitas Penyimpanan Tenaga Listrik) is TERBUKA — open to 100% foreign ownership via PT PMA. No local Indonesian partner required. (Source: Perpres 10/2021 as amended by Perpres 49/2021 — the investment-list annexes predate KBLI 2025; per-code crosswalk audit in progress.)
What license is required for KBLI 35132?
KBLI 35132 has a Tinggi risk classification. Required license: NIB + Izin. Processing time: 14.
What is KBLI 35132?
KBLI 35132 is the Indonesian business classification code for "Aktivitas Penyimpanan Tenaga Listrik" (Electricity Storage). It falls under Section D of KBLI 2025, the Indonesian Standard Industrial Classification updated by BPS (Regulation 7/2025). The June 2026 KBLI 2025 transition window has closed; operators should verify the code's current OSS/NIB treatment before relying on it for licensing, reporting, or amendments.
How did KBLI 35132 change from KBLI 2020 to 2025?
KBLI 35132 was mapped from previous code 35114 (KBLI 2020). PP28 uses KBLI 2020 code 35114 (Penjualan Tenaga Listrik...). Match: 94% The code was renumbered but the business activity scope is essentially unchanged. The June 2026 KBLI 2025 transition window has closed. If an NIB still relies on legacy KBLI 2020 mappings, treat the migration as overdue and verify/remediate the OSS record before new license applications, amendments, LKPM, import approvals, or investor/worker sponsorship.

Related Codes

35133Section D★

EV & Electrical Equipment Charging Stations

Pengoperasian Fasilitas atau Stasiun Pengisian Daya untuk Kendaraan dan Peralatan Listrik

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35131Section D

Electricity Transmission

Aktivitas Penyaluran Tenaga Listrik

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35140Section D

Integrated Electricity Supply Business

Penyediaan Tenaga Listrik dalam Satu Kesatuan Usaha

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35120Section D

Renewable Power Generation

Pembangkitan Tenaga Listrik dari Sumber Energi Terbarukan

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35151Section D

Power Generation & Grid Operation Services

Pengoperasian Instalasi Penyediaan Tenaga Listrik

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35112Section D★

Non-Emitting Non-Renewable Power Generation

Pembangkitan Tenaga Listrik dari Sumber Energi Tidak Terbarukan yang Tidak Menghasilkan Emisi

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
🏢

Ready to register this business?

Bali Zero handles PT PMA setup, KBLI registration, NIB, and all licensing for KBLI 35132.

PT PMA Setup

IDR 20.000.000

Company registration, KBLI, NIB, domicile

Virtual Office

IDR 5.000.000

Legal address for your PT PMA in Bali

5,000+ companies registered since 2020

Get started on WhatsApp
5k+
Clients
★ 4.9
Reviews
~15 min
Response
Talk on WhatsApp
Zantara AIOSS Intelligence System
Context35132
Ask me anything about KBLI 35132 — Electricity Storage. Licensing, PMA rules, what changed in 2025, or how it works in Bali.