KBLI Navigator/Section D/35151
KBLI 35151

Power Generation & Grid Operation Services

Pengoperasian Instalasi Penyediaan Tenaga Listrik

⚡ Section D — Electricity & Gas Supply

In Bali: open to a PT PMA

✅Open· 100% ForeignHigh RiskRenumbered🏝️✅Registrable in Bali· medium conf.✓OSS-verified · KBLI 2025

Operating Indonesia’s Power Infrastructure, Without a Bali PMA Block

This code covers third-party operation of electricity generation, transmission, and distribution facilities, open nationally to full foreign ownership and not blocked for PMA in Bali.

By the numbers
National PMA ceiling
100%
Open to scales
Mikro, Kecil, Menengah, Besar
PMA source
Perpres 10/2021, 49/2021
Bali status
Registrable in Bali
On the data provided, KBLI 35151 is nationally open to full foreign ownership and is not blocked for PMA registration in Bali by the moratorium.
What Changed

KBLI 2020→2025 mapping: code renumbered.

What You Need

Nationally, this activity is 100% open to foreign ownership. In Bali, it is not blocked by the general moratorium, but because it carries medium-high risk, any PMA application will likely face closer scrutiny of the business location, operational permits, and compliance with provincial spatial plans.

Who This Is For

Foreign power operators or energy service companies that manage and run existing power plants, grids, or distribution systems under long-term contracts or public-private partnerships.

Licensing Overview
Risk LevelTinggi
License TypeNIB + Izin
Foreign Ownership100% Open
Processing5 working days
2020 → 2025
Previous codes (KBLI 2020): 35121— PP28 uses KBLI 2020 code 35121 (Pengoperasian Instalasi Penyed...). Match: 100%
BPS crosswalk
Official BPS 2020 → 2025 crosswalk ancestors: 35121

Source: the BPS 2020↔2025 conversion table, mechanically extracted and acceptance-gate verified. It shows which 2020 codes map to this 2025 code — provenance only, not a licensing claim: the regulatory regime of these predecessor codes has not been adjudicated as transferring.

Sources & Verification

Each data layer below traces to a government source with its KBLI vintage — or is declared as a gap. Nothing in these layers is silently filled in.

Activity definition
BPS Peraturan 7/2025 + PP 28/2025VerifiedKBLI 2025

Title and scope as defined by the KBLI-2025 classification.

locator: OSS_RBA_2025_id_version_fff4053d

Risk & licensing
OSS RBA risk scope (ruang lingkup)VerifiedKBLI 2025

Risk category and licensing rows are KBLI-2025-native from the OSS Risk-Based Approach catalog.

locator: OSS_RBA_resiko_2025

Foreign ownership (PMA)
Perpres 10/2021, 49/2021Audit pendingKBLI 2020

The investment-list annexes predate KBLI 2025; the per-code crosswalk audit of this layer is in progress. The value shown is the annex text, disclosed with its vintage.

Bali status
Bali province blocks ALL Low + Medium-Low risk KBLI for PMA (island-wide, permanent) (effective 2026-05-13)Audit pending2026 overlay

Conservative posture derived from the risk tier · confidence MEDIUM.

Dataset last updated 2026-07-26 · KBLI 2020 and KBLI 2025 reuse code numbers for different activities — cross-vintage rows are labeled, never merged silently.

Common Questions
Can foreigners operate a power generation & grid operation services business in Indonesia?
Yes. KBLI 35151 (Pengoperasian Instalasi Penyediaan Tenaga Listrik) is TERBUKA — open to 100% foreign ownership via PT PMA. No local Indonesian partner required. (Source: Perpres 10/2021 as amended by Perpres 49/2021 — the investment-list annexes predate KBLI 2025; per-code crosswalk audit in progress.)
What license is required for KBLI 35151?
KBLI 35151 has a Tinggi risk classification. Required license: NIB + Izin. Processing time: 5.
What is KBLI 35151?
KBLI 35151 is the Indonesian business classification code for "Pengoperasian Instalasi Penyediaan Tenaga Listrik" (Power Generation & Grid Operation Services). It falls under Section D of KBLI 2025, the Indonesian Standard Industrial Classification updated by BPS (Regulation 7/2025). The June 2026 KBLI 2025 transition window has closed; operators should verify the code's current OSS/NIB treatment before relying on it for licensing, reporting, or amendments.
How did KBLI 35151 change from KBLI 2020 to 2025?
KBLI 35151 was mapped from previous code 35121 (KBLI 2020). PP28 uses KBLI 2020 code 35121 (Pengoperasian Instalasi Penyed...). Match: 100% The code was renumbered but the business activity scope is essentially unchanged. The June 2026 KBLI 2025 transition window has closed. If an NIB still relies on legacy KBLI 2020 mappings, treat the migration as overdue and verify/remediate the OSS record before new license applications, amendments, LKPM, import approvals, or investor/worker sponsorship.

Related Codes

35152Section D

Electrical Installation Operation Services

Pengoperasian Instalasi Pemanfaatan Tenaga Listrik

→
🏝️✅Registrable in Bali✅Open· 100% ForeignMedium-High Risk
35140Section D

Integrated Electricity Supply Business

Penyediaan Tenaga Listrik dalam Satu Kesatuan Usaha

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35159Section D

Other Electricity Support Services

Aktivitas Penunjang Tenaga Listrik Lainnya

→
🏝️🚫Blocked in Bali (risk-class moratorium)✅Open· 100% nat'l · blocked in BaliMedium-Low Risk
35133Section D★

EV & Electrical Equipment Charging Stations

Pengoperasian Fasilitas atau Stasiun Pengisian Daya untuk Kendaraan dan Peralatan Listrik

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35132Section D

Electricity Storage

Aktivitas Penyimpanan Tenaga Listrik

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
35131Section D

Electricity Transmission

Aktivitas Penyaluran Tenaga Listrik

→
🏝️✅Registrable in Bali✅Open· 100% ForeignHigh Risk
🏢

Ready to register this business?

Bali Zero handles PT PMA setup, KBLI registration, NIB, and all licensing for KBLI 35151.

PT PMA Setup

IDR 20.000.000

Company registration, KBLI, NIB, domicile

Virtual Office

IDR 5.000.000

Legal address for your PT PMA in Bali

5,000+ companies registered since 2020

Get started on WhatsApp
5k+
Clients
★ 4.9
Reviews
~15 min
Response
Talk on WhatsApp
Zantara AIOSS Intelligence System
Context35151
Ask me anything about KBLI 35151 — Power Generation & Grid Operation Services. Licensing, PMA rules, what changed in 2025, or how it works in Bali.