Hydropower Reservoir Construction
Konstruksi Reservoir Pembangkit Listrik Tenaga Air
🏗️ Section F — Construction
In Bali: open to a PT PMA
The Civil Works Behind Hydropower’s Water System
This activity covers the constructed water-control infrastructure of a hydropower plant, with national PMA openness and no Bali moratorium block recorded.
Nationally open to PMA up to 100% foreign ownership, this activity is not blocked by Bali’s cited moratorium.
Direct 1:1 match from KBLI 2020 — code and scope unchanged.
What You Need
Who This Is For
A foreign engineering or construction firm that builds major hydropower infrastructure, typically targeting power plant projects outside Bali where the moratorium does not apply.
Source: the BPS 2020↔2025 conversion table, mechanically extracted and acceptance-gate verified. It shows which 2020 codes map to this 2025 code — provenance only, not a licensing claim: the regulatory regime of these predecessor codes has not been adjudicated as transferring.
KBLI 2025 Construction: Building Development, Villa Projects & Prefab
kita.balizero.comSources & Verification
Each data layer below traces to a government source with its KBLI vintage — or is declared as a gap. Nothing in these layers is silently filled in.
Title and scope as defined by the KBLI-2025 classification.
locator: OSS_RBA_2025_id_version_fff4053d
Risk category and licensing rows are KBLI-2025-native from the OSS Risk-Based Approach catalog.
locator: OSS_RBA_resiko_2025
The investment-list annexes predate KBLI 2025; the per-code crosswalk audit of this layer is in progress. The value shown is the annex text, disclosed with its vintage.
Conservative posture derived from the risk tier · confidence MEDIUM.
Dataset last updated 2026-07-26 · KBLI 2020 and KBLI 2025 reuse code numbers for different activities — cross-vintage rows are labeled, never merged silently.
Can foreigners operate a hydropower reservoir construction business in Indonesia?
What license is required for KBLI 42914?
What is KBLI 42914?
How did KBLI 42914 change from KBLI 2020 to 2025?
Related Codes
Coastal Protection Structure Construction
Konstruksi Bangunan Sipil Pelindung Pantai
Fishery Port Construction
Konstruksi Bangunan Pelabuhan Perikanan
Other Water Infrastructure Construction
Konstruksi Bangunan Sipil Prasarana Perairan dan Sejenis Lainnya
Non-Fishery Port Construction
Konstruksi Bangunan Pelabuhan Bukan Perikanan
Oil & Gas Civil Works Construction
Konstruksi Bangunan Sipil Minyak dan Gas Bumi
Water Resource Infrastructure Construction
Konstruksi Bangunan Prasarana Sumber Daya Air
Ready to register this business?
Bali Zero handles PT PMA setup, KBLI registration, NIB, and all licensing for KBLI 42914.
PT PMA Setup
IDR 20.000.000
Company registration, KBLI, NIB, domicile
Virtual Office
IDR 5.000.000
Legal address for your PT PMA in Bali
5,000+ companies registered since 2020
Get started on WhatsApp