Other Building Finishing
Penyelesaian Konstruksi Bangunan Lainnya
🏗️ Section F — Construction
In Bali: open to a PT PMA
Beyond the Build: Finishing Work That Makes a Building Complete
This activity spans the fitted, decorative and practical finishing work that turns a construction project into a usable, recognisable space.
In Bali, this activity is not caught by the PMA moratorium because its large-scale OSS risk is medium-high or high.
KBLI 2020→2025 mapping: matched with aggregation.
Who This Is For
A foreign fit-out specialist, renovation contractor, or high-end furnishing / exhibition stand builder looking to serve projects in Bali.
Source: the BPS 2020↔2025 conversion table, mechanically extracted and acceptance-gate verified. It shows which 2020 codes map to this 2025 code — provenance only, not a licensing claim: the regulatory regime of these predecessor codes has not been adjudicated as transferring.
KBLI 2025 Construction: Building Development, Villa Projects & Prefab
kita.balizero.comSources & Verification
Each data layer below traces to a government source with its KBLI vintage — or is declared as a gap. Nothing in these layers is silently filled in.
Title and scope as defined by the KBLI-2025 classification.
locator: OSS_RBA_2025_id_version_fff4053d
Risk category and licensing rows are KBLI-2025-native from the OSS Risk-Based Approach catalog.
locator: OSS_RBA_resiko_2025
The investment-list annexes predate KBLI 2025; the per-code crosswalk audit of this layer is in progress. The value shown is the annex text, disclosed with its vintage.
Conservative posture derived from the risk tier · confidence MEDIUM.
Dataset last updated 2026-07-26 · KBLI 2020 and KBLI 2025 reuse code numbers for different activities — cross-vintage rows are labeled, never merged silently.
Can foreigners operate a other building finishing business in Indonesia?
What license is required for KBLI 43309?
What is KBLI 43309?
How did KBLI 43309 change from KBLI 2020 to 2025?
Related Codes
Painting
Pengecatan
Floor, Wall & Ceiling Finishing
Pengerjaan Lantai, Dinding, dan Plafon
Glass, Door & Window Installation
Pemasangan Kaca, Pintu, Kusen, Jendela, dan Sejenisnya
Specialised Construction Intermediary
Jasa Intermediasi Konstruksi Khusus
Structural Engineering & Assembly
Pemasangan dan Rekayasa Struktur Bangunan
Scaffolding Installation
Pemasangan Perancah (steger)
Ready to register this business?
Bali Zero handles PT PMA setup, KBLI registration, NIB, and all licensing for KBLI 43309.
PT PMA Setup
IDR 20.000.000
Company registration, KBLI, NIB, domicile
Virtual Office
IDR 5.000.000
Legal address for your PT PMA in Bali
5,000+ companies registered since 2020
Get started on WhatsApp